最近免费中文视频I日韩在线在线I久久久久亚洲I久久久久一区二区三区I北条麻妃av一区二区三区I成人午夜精品I182tv午夜福利久久久久久I亚洲熟女视频I伊人之家之中文字幕

產(chǎn)品列表PRODUCTS LIST

聯(lián)系信息

  • 電話:
    189-2580-2250
  • 傳真:
    18925802250
GMW 4205
點(diǎn)擊次數(shù):1659 更新時間:2019-09-25

GMW 4205

本頁面標(biāo)準(zhǔn)信息均來源于網(wǎng)絡(luò)收集,或由參與標(biāo)準(zhǔn)制定的供應(yīng)商提供,只作為參考使用,為確保測試結(jié)果的準(zhǔn)確性、節(jié)省您的時間,如需GMW 4205標(biāo)準(zhǔn)詳細(xì)信息或GMW 4205具體測試方法,請與我們技術(shù)人員聯(lián)系或給我們留言,我們將為您提供相關(guān)的技術(shù)支持。

 

1 Scope

This specification covers requirements fora corrosion resistant black organic finish over an electrolytically depositedzinc-iron alloy, nickel alloy and/or zinc-nickel alloy substrate.

1.1 MaterialDescription.This coating system shall be free ofchromium. The final product shall conform to GMW3059 requirements. The platingshall be called out on the part drawing per example shown in paragraph 7.

1.1.1MaterialIdentification. Not applicable.

1.2 Cross-Reference of Replaced Specifications.

GMW

GMW4205

Delta Motors

 

GM do Brasil

 

GM Holdens

 

GMNA

GM8138M

ISZ

 

ITDC

 

SAAB

 

1.2.1Specifications Qualified to this Material Specification. Notapplicable.

1.3Symbol.Not applicable.

1.4TypicalApplication. This coating is intended primarily forbulk processed small steel parts such as bolts, screw and nuts used on exteriorvisible parts. This coating is especially suitable for internal drive (crossrecess, 6 lobed socket etc.) threaded fasteners and self drilling and tappingscrews.

1.5Remarks. se of this coating system on threaded surface and/or bearingsurface of joints could effect the torque-tension relationship. It isrecommended that a torque-tension study of the fastener joint be performedbefore releasing this finish on any new application.

2 References

Note:Only the latest approved standards areapplicable unless otherwise specified.

2.1Normative

DIN 946

ISO 9227

SAE J1960

SAE/SCAR-5

SAE/SCAR-11

ISO 1463

 ASTM D523

SAE/SCAR-1

SAE/SCAR-7

2.2GM.

GM4260P

GM9071P

GM9540P

GMW3059

GM4265P

GM9501P

GMW3001

2.3 Additional. None.

3Requirements

3.1Requirementson Delivery

3.1.1ChemicalRequirements. Not applicable.

3.1.2MechanicalRequirements. Not applicable.

3.1.3PhysicalRequirements.

3.1.3.1Appearance. This finish shall provide uniform black color on coated parts. Thefinished part shall have a gloss of 4 or higher (20 degree gloss meter per ASTMD523).

Note:Gloss level of the finished parts (whensmall) shall be measured on standard panel (steel, 75×200mm) processed with the production parts.

3.1.3.2 This finish shall not fill driver recess or threads nor interferewith normal fastener installation procedures. The finish shall withstand normalhandling and storage conditions without damage (chipping, flaking or other) andmust not stain or transfer to adjacent parts or operators hands.

3.1.3.3 The total coating system as received shall not adversely affect thedrive system: Internal recess dimensions, hex size, etc. or function of thefastener.

3.1.3.4Thickness. Typical zinc-iron, nickel or zinc-nickel alloy layer shall be (5…20)μm and topcoat layer shall be 25 μmmax, with a total thickness ≤45μm。

3.1.3.4.1 Thickness shall be determined by microscope examination of crosssections taken perpendicular to significant surfaces. See GM4260P, RecommendedPractices for Measuring Thickness of Plated Deposits and Anodic Coatings (SeeGM4260P).

3.1.3.4.2 In Case of bolts and screws, plating thickness shall be determinedat top of head at midpoint of largest continuous surface. In case of nuts,determine at midpoint of flats (wrenching facets).

3.1.3.4.3The maximum thickness of coating which may be applied to threads onthreaded products is limited by the basic thread size (tolerance h or H). Aftercoating, parts must gage with appropriate basic size GD thread gage. Threadsmay be produced undersize/oversize (before coating) to accommodate the coatingthickness, providing the finished product (after coating) meets all specifiedmechanical properties. Where mechanical properties are not specified,undersizing/oversizing is subject to approval by pertinent engineer, and allundersize/oversize shall be within permissible limits as agreed upon.

3.1.3.dhesion.Parts coated to this specification shall show noevidence of blistering or other appearance changes after exposure to humiditytesting per GM4465P for ≥96h. When tape tested per GM9071P, 10min after removal from humiditythere shall be ≤3.0min total peel back (peel back adding both sides of scribed line)from the lines scribed in an “X” and no other peeling in the area under thetape. This is not applicable to threaded fasteners.

Note: This test is applicable for initialapproval, applicator approval and PPAP submission parts.

3.1.3.5WeatheringCharacteristics. Parts coated to this specificationshall show no blistering, peeling, cracking, loss of adhesion, discoloration,or red rust after 1316.7 KJ/m2 in xenon arc per SAE J1960. After weatheringtest finished parts shall have a gloss level of 3 or higher (20 degree glossmeter, per ASTM D528)

Note:The weathering test shall be required to runfor initial approval only.

3.1.3.7CorrosionResistance. Significant surfaces of parts exposedto neutral salt spray per ISO 9227 shall show no white corrosion after 48hexposure, ≤10% white corrosion products after 144h, and no base metal corrosionafter 480h exposure. For this test externally threaded fasteners shall be powerdriven into a tapped hale or nut or steel panel, simulating production usage,removed, then installed finger tight or with a hand driver with proper drivebit into acrylic plastic or other inert panel, and exposed in salt spray at (15…30)°from thevertical to allow wetting per SAE/SCAR-1. Fasteners shall not drip on otherfasteners during the test.

3.1.3.7.1Normal production, processes that are in statistical process controlshall yield parts that are capable of meeting the salt spray requirements.

3.1.3.7.2 A periodic NSS test of the parts being processed on each linerunning this coating shall be conducted with sample size of 3 pieces minimumper line per shift.

3.1.3.7.3Actual processing control checks to be made and recorded shall bebased on chemical manufacturer’s instruction.

3.1.3.7.4 Parts must be NSS tested to meet the corrosion resistancerequirements on significant surfaces for initial approval of the finish,applicators and PPAP submissions. NSS test need not be completed prior toshipment of parts.

3.1.3.7.5 Significant surfaces for test evaluation include but are notlimited to fastener head, socket recess, semswasher and external nut surface.Sharp edges are excluded.

3.1.3.7.6Significant surface on parts other than threaded fasteners shall beall surfaces excluding sharp edges.

3.1.3.8AcceleratedCorrosion Test. Accelerated corrosion test shall beconducted with this finish coated parts,11516629 or similar cross recessed headscrews using production methods(sample size,N≈10 minimum). The testscrews shall be power driven and seated with production type tooling into 60/60galvanized steel test panels that have been painted with standard GMpretreatment, primer, and white base coat/clear coat.

The test screw shall be installed in ahorizontal row seated 25 mm min, apart. The screw shall be tested for 40 cyclesper GM8540P. Accelerated Corrosion Test.

After 24 test cycles, the screw heads shallexhibit no red rust and 30% max. white corrosion coverage. After 40 testcycles, the screw heads shall exhibit 10% max. red rust coverage and 50% max.white corrosion coverage. Note that all visible surfaces of the seated screwheads including screw heads edges shall be included in the percent of corrosioncoverage.

Note: This test is required for the initialapproval of the finish only.

3.1.3.9TemperatureResistance. After heating the parts for 1h at 150℃(parttemperature) the corrosion resistance requirements as specified in paragraph3.1.3.7 shall still be met. This test requirement is only for initial approvalof the finish material.

3.1.3.10GasolineResistance. For initial approval of new material,coated parts shall be soaked for (200±2)s in gasoline as described in GM9501P.After removal of the parts, they shall be allowed to air dry before visualexamination. There shall be no color change, wrinkling, or any other change inthe coating appearance.

3.1.3.11Reliefof Hydrogen Embrittlement. ALL parts heat treatedor highly cold worked to a specified core hardness HRC 32 or greater or surfacehardness HRC 35 or greater, that are processed by the finish applicator perSAE/SCAR-5 and tested for de-embrittlement per SAE/SCAR-7. The sample sizefor the SAE/SCAR-7 test shall be per ASTM F1470.

3.1.3.11.1 When supplementary treatment is specified for a part that requiresbaking after plating, the supplementary treatment shall be applied after thebaking operation.

3.1.3.11.2 Hardened parts which have been tempered at <+175℃ shall beheated to +150℃ and held 8 h, or longer, if necessary.

3.1.3.12Torque-Tension Test. Metric threaded fasteners M6and larger shall be subject to torque-tension monitoring through the use ofsurrogate M 10×1.5 test bolts. Ten surrogate bolts shall be processed with theproduction parts. A minimum of 10 bolts per finish line per shift shall bemonitored per SAE/SCAR-11. except tightening speed shall be (30±3)min-1(RPM). The six (6) sigma torque range values shall be within the listed range(see Table 1). The Test result shall be maintained on file to be submitted whenrequired.

Table1:Torque Range Values

Thread Size

Surrogate Bolt Part Number

Test Nut Part Number

Test Washer Part Number

Torque in Nm SAE/SCAR 11

Tension in kN

M10×1.5

11516105

11516090

11502644

48±8

28.3

Note:Engineering drawings for surrogate fastenersfor Torque-tension test are available from Global Engineering Documents/HIS.

3.1.3.13 Coefficient of Friction. The coefficient of friction of threadedfasteners shall be 0.13±0.03(six sigma values) when tested per DIN 946 with thefollowing exceptions:

·  Tightening speed shall be (30±3)min-1(RPM)

·  Test samples (excluding drivenfasteners) shall be thoroughly cleaned with an appropriate fluid/chemical toremove any grease/oil/wax/other contaminants.

·  Test clamping force shall becalculated as 75% of proof load.

Note:Both, Torque-Tension and Coefficient ofFriction tests are required only for the initial approval of the finish material.Suppliers/Applicators can run either Torque-Tension Test or Coefficient ofFriction Test for quality control.

3.1.4AdditionalRequirements. Not applicable.

3.2ProcessingRequirements. Subparagraphs were not applicable.

3.3PerformanceRequirements. Subparagraphs were not applicable.

3.4Requirementson other Stages during Life Cycle.

3.4.1ChemicalRequirements.

3.4.1.1Recyclability. Parts with this coating shall nothave any negative effect on recyclability of the parts.

3.4.1.2PhysiologicalSafety. The coating material must not cause anyhealth hazard either to line operators or customers.

3.4.2Mechanical Requirements. Not applicable.

3.4.3PhysicalRequirements. Not applicable.

3.4.4AdditionalRequirements. Not applicable.

4 Manufacturing Process

Not applicable.

5 Rules and Regulations

5.1All materials supplied to this specification must comply with therequirements of GMW3001. Rules and Regulations for Material Specifications.

5.2 All materials supplied to this specification must comply with therequirements of GMW3059. Restricted and Reportable Substances for Parts.

6Approved Sources

Suppliers to this specification must beapproved by the Specialist Team/ TDGs. GMNA approved suppliers names are availableon the on-line MATSPC System.

For other GM locations the responsibleengineering group should be contacted to obtain the approved sources in theindividual countries.

7 Coding System

This material specification shall bereferenced in other documents, drawings, VTS, CTS, etc. as follows:

“GMW4205”

Where

GMW =  GM worldwide

4205 =  Specification number

8 Release and Revisions

8.1Release. This material specification was first approved in AG 2001 andpublished in OCT 2001.

8.2Revisions. Not applicable.

上一篇:GMW14872-2013

下一篇:GMW 3414-2002

返回列表>>
聯(lián)系人
在線客服
用心服務(wù) 成就你我

粵公網(wǎng)安備44190002001386號

主站蜘蛛池模板: 国产视频xxx| 办公丝袜av一区二区三区 | 中文字幕亚洲欧美在线不卡 | gv手机在线观看 | 亚洲欧洲国产码专区在线观看 | 亚洲精品国产欧美在线观看 | 国产精品碰碰现在自在拍 | 999久久久久久久久6666 | 又粗又大又黄又硬又爽免费看 | 亚洲视频黄色 | 久久精品探花 | 精品成在人线av无码免费看 | 日本成人精品在线 | 春药高潮抽搐流白浆在线观看 | 欧美国产日韩另类 | 亚洲日本久久久 | www人人草 | 亚洲日韩av无码中文字幕美国 | 日本免费黄色 | 亚洲成av人影片在线观看 | a爱视频| 亚洲色图一区二区 | 国产伦精品一区二区三区视频孕妇 | a级黄色网| 国产极品美女高潮无套嗷嗷叫酒店 | 蜜臀av性久久久久蜜臀aⅴ涩爱 | 五月婷婷爱爱 | 动漫人妻无码精品专区综合网 | 国产无遮挡猛进猛出免费软件 | 国内精品伊人久久久久网站 | 操出白浆视频 | 亚洲国产成人爱av在线播放 | 情侣酒店偷拍一区二区在线播放 | 欧美做受喷浆在线观看 | 人妻忍着娇喘被中进中出视频 | 亚洲综合色区无码专区 | 香蕉久久久久久av成人 | 久久中文一区二区 | 伊人久久久精品区aaa片 | 成人免费ā片在线观看 | 韩国无码av片在线观看网站 | 越南性xxxx精品hd | 川上奈美侵犯中文字幕在线 | 欧美一级少妇 | 亚洲 欧美 视频 手机在线 | 91碰碰 | 97成人精品视频在线播放 | 国产情侣激情在线视频 | 精品人妻伦九区久久aaa片69 | 和漂亮岳做爰3中文字幕 | 丰满少妇av | 久久天天躁狠狠躁夜夜96流白浆 | 中文字幕永久免费视频 | 成年无码按摩av片在线观看 | 蜜臀av在线播放一区二区三区 | 国产全肉乱妇杂乱视频男男 | 国产精品久久无码一区二区三区网 | 67194成人 | 青草一区| 日本少妇毛耸耸毛多水多 | 天天干导航 | 淫妹妹影院 | 亚洲—本道中文字幕东京热 | 中国国产精品 | 亚洲精美视频 | 国产呻吟对白刺激无套视频在线 | 日韩av线观看 | 98色精品视频在线 | 饭岛爱av片在线播放 | 国产福利精品在线 | 日本中文字幕在线视频二区 | 午夜亚洲国产理论片二级港台二级 | 3d无码纯肉动漫在线观看 | 天堂视频在线 | 亚洲免费视频在线 | 91精品国产91久久久久游泳池 | 日韩精品99久久久久中文字幕 | 狠狠色丁香婷婷综合久久来来去 | 亚洲国产精品一区第二页 | 一本岛高清乱码2020叶美 | 日本极品级片 | a级片免费播放 | wwwyjizcom性欧美| 天堂va久久久噜噜噜久久va | av中文网站 | 人人婷婷人人澡人人爽 | 亚洲好骚综合 | 老司机久久99久久精品播放 | 中文字幕久久av | a毛片在线观看 | 日日夜夜精品免费 | 17婷婷久久www | 欧美 日韩 国产 成人 | 久久久久性色av毛片特级 | 精品人妻系列无码人妻在线不卡 | 日韩欧美激情视频 | 国产男女av | 人人人妻人人澡人人爽欧美一区 | 亚洲激情在线观看视频 |